
Master carpenter · dry wall, solid joint
Bathroom renovation in Tallinn and Harjumaa
Demolition, plumbing, damp proofing and tiling from one team. The shower area gets proper protection.
Bathroom
A beautiful tile does not save from moisture damage
Bathroom renovations often fail where you can't see: moisture resistance and plumbing. We'll start with them — the plates will come later.
We do full or partial renovation. We help you choose tiles and sanitary ware. If desired, it can also be done within the project sauna.
- Moisture resistance before tilesMin 2 layers of liquid membrane in the shower area (WPI II).
- The plumbing is fineWater and sewage pipes before finishing.
- One teamFrom demolition to grouting — without "who built the wall?" without question.

Stages
Bathroom renovation in six steps
Planning
Measurement, slabs, extent, KÜ if required.
Demolition
Removal of old tiles, preparation of the base.
Pipe and electricity
Water and sewage pipes, wiring if necessary.
Moisture resistance
Liquid membrane or certified system before tiles.
Plates
Walls and floor, grouting.
Finishing
Sanitary engineering, seals, cleaning, handover.
Scope
What is included in the bathroom renovation
We write specific works in the offer — not "full service" without explanation.
- Demolition and debris removal
- Renewal or diversion of water and sewage pipes
- WPI II moisture resistance in the shower area (min 2 layers)
- Wall and floor tiles, grouting
- Sanitary engineering, seals, cleaning
Partial repair: replacement of tiles, restoration of moisture resistance or pipe repair — without opening the entire room. If desired installment payment up to €10,000.
Full or partial
Full repair when pipes and plates are exhausted. Partial if the structure holds and only a top layer or one node is required.
Real projects
Finished bathrooms from our sites
Tiling, showers, toilets and wet rooms — including in log houses. Click a photo to enlarge.
The price depends on the scope and materials
Full or partial repair, choice of tiles and room size. We prepare a free offer after visiting the object — not a phone estimate.
KKK
so frost heave does not lift the structure.
Does the bathroom renovation need a building notice in the apartment?
Apartment remodeling without changing the load-bearing wall is usually not. Pipeline redirection or a change in layout may require the approval of the apartment association.
What is the WPI II requirement in Estonia?
The shower area and bath area must be completely covered with moisture resistance — at least 2 layers of liquid membrane or a certified sealing system.
Do you also do partial repairs?
Yes — replacement of tiles, repair of plumbing or renovation of sanitary equipment without a full renovation.
How long does it take to repair a bathroom?
Partial 1-2 weeks, full repair often 2-4 weeks — depending on piping and tiling volume.
Is moisture resistance a separate line?
No — this is a mandatory part before tiling. Tiling cannot begin without a correct layer.
See also
Related services

A bathroom that stays dry
Describe the need — full or partial. We'll come take a look and give you a free quote.
- Free on-site measurement
- We usually respond within 24 hours
- 3-year written warranty
Or write: info@puuseppmeister.ee





