Call Get a free quote
Korteri kapitaalremont Tallinnas

Master carpenter · from systems to finishes

Apartment overhaul in Tallinn and Harjumaa

Deep Renovation: Plumbing, Electrical, Structural and All Finishing. From demolition to keys — one team, a clear order.

Pipe 5 year warranty Changes to the plan 8-12 weeks (50 m²)
Overhaul demontaaži faasis Dismantling · overhaul

What is an overhaul

When finishing is no longer enough

The overhaul is a deep renewal: technical systems, constructions and the entire finish. It's not cosmetics — it's putting the "skeleton" of the apartment back in place.

We carry out from demolition to handing over the keys: pipe and electricity, partitions, parquet, bathrooms and kitchen from one team.

  • Object analysis before biddingWe evaluate what needs to be replaced — not just what catches the eye.
  • Order in placeIn a capital repair, the works depend on each other; let's keep the stages in the right order.
  • DocumentationIf necessary, we help with approvals and permits.

When to choose capital

Three signs that the top coat is not helping

Depreciated pipes and electricity

Old galvanized piping or aluminum wires — staining on top does not solve leaks or safety.

Moisture damage

Damage hidden under the bathroom or kitchen requires dismantling and new waterproofing.

The plan doesn't fit

Partition changes, an open kitchen or a bathroom with a sauna — as part of a major renovation, this is logical.

The process

Overhaul in six stages

1

Analysis and offer

Inspection of the object, evaluation of the volume of work, schedule.

2

Dismantling

Removal of old covers, pipes and wires, removal.

3

General construction

Partitions, leveling of ceilings, leveling of floors.

4

Engineering works

New plumbing, sewage, electricity, ventilation.

5

Finishing

Plaster, tiling, parquet, paint, furniture.

6

Final inspection

Cleaning, documentation, warranty.

Work

List of capital repair works

  • Complete demolition and removal
  • Renewal of piping and sewerage
  • Upgrading the electrical system
  • Gypsum, plaster, putty, paint
  • Replacement of all floors
  • Complete renovation of the bathroom and kitchen
  • Installation of doors and moldings

Price

Approximate prices

TööPrice level
Overhaul450-650 €/m²+
50 m² apartment25 000–40 000 €
Duration (50 m²)8-12 weeks

Exact offer after detailed inspection. Repair price · stages.

Comparison

Refresh versus Overhaul

If the top layer hides leaks or exhausted piping, it must be opened — not painted over.

A questionCosmetic / StandardOverhaul
Plumbing and electricityThey will stay, if it's okayComplete update
DismantlingLimitedLoose layers and knots
PlanningUsually unchangedPartitions, openings possible
Landmark 50 m²Lower €/m², shorter time€450-650/m²+, 8-12 weeks

We will decide together on the object: whether it is enough to repair or whether capital is needed. An honest assessment will save you surprises later.

KKK

so frost heave does not lift the structure.

When is an overhaul necessary?

If the plumbing and electricity have depreciated, there is moisture damage, or the layout is no longer suitable.

Can the layout of the apartment be changed?

Yes — partitions construction or demolition is possible with a coordinated project.

How long will the overhaul last?

50 m² apartment 8-12 weeks, depending on the volume of work.

Is a building permit required?

Some renovations require approval — we advise and help with documents.

Do you also make a bathroom with a sauna?

Yes — sauna construction and bathroom renovation in one project.

What warranty applies?

Plumbing 5 years, electricity and finishing 2 years.

Korteri kapitaalremont Tallinnas

Are you planning a major renovation?

Call or write — we'll come and see, evaluate the systems and write down a fair offer.